BKW Pipeline Technologies

World Leader in Pipeline Technology and Equipment

BKW Home Pig Switches Tadpole Pig Pigging Equipment Anchors Slug Catcher
Engineering Support Custom Services Roof Raising Research & Development
 Gas Gathering System For Sale Download Articles anipatern01_a.gif Pipeline College Contact Us
  Bullets010.gifClick here to view our latest projects!  
 

East Texas Anchor Project-36" Pipeline

Latest anchor project includes a 36-inch pipeline located in east Texas. Work included a soil survey that consisted of using a Cat 330 backhoe to pull test anchors in areas requiring buoyancy control. Anchors were installed on a spacing of 50-feet and pull tested at 12,000 lbs. per anchor or 24,000 lbs. per set. The spacing of 50-feet eliminated 5 concrete set-on weights weighing 9,000 lbs. each. Since the installed cost of set-on weights and auger anchors was approximately the same, the cost savings using auger anchors was $4,000.00 per anchor. This project required 320 auger anchors and saved the pipeline company a total of $1,280,000.00.

In addition to the cost savings, the pipeline company received a documented engineered anchor system. As each anchor was installed, the anchor was pull tested and this information was documented along with the station number.

Anchor Work East Texas by BKW Inc. East Texas Anchor Job  by BKW, Inc. Oct. 06

 



BKW, Inc.
P.O. Box 581611   Tulsa, OK 74158

Phone: 918.836.6767   Fax: 918.836.0141


e-mail: bkwinc@aol.com


BKW Home Pig Switches Tadpole Pig Pigging Equipment Anchors Slug Catcher
Engineering Support Custom Services Roof Raising Research & Development
 Gas Gathering System For Sale Download Articles anipatern01_a.gif Pipeline College Contact Us
  Bullets010.gifClick here to view our latest projects!  
Website by PRO Designs