BKW Pipeline Technologies

World Leader in Pipeline Technology and Equipment

BKW Home Pig Switches Tadpole Pig Pigging Equipment Anchors Slug Catcher
Engineering Support Custom Services Roof Raising Research & Development
 Gas Gathering System For Sale Download Articles anipatern01_a.gif Pipeline College Contact Us
  Bullets010.gifClick here to view our latest projects!  
 

Latest job for Pirelli included the design and fabrication of a jack to be used to pull electric cable through a J-tube.The J-tube was attached to an offshore production platform in 1000 feet of water. The jack was designed to be used in a very congested area of the platform with a load capacity of 40,000 lbs. and a 5 foot long stroke. The jack was segmented and assembled onsite. Two hand pumps were used to provide the hydraulic power. The entire job onsite took 12 hours.
BKW #2 Lift Plate for cable removal BKW D1 Cable Recovered
Primary lift plate used to make room for main lift plate shown in place

BKW 2nd Lift Ready for cable removal

Main lift ready for cable removal

Cable Recovered

 BKW Jacking Bridge on Cable Removal

Call us for details and pricing!

Installing lift in congested area

 



BKW, Inc.
P.O. Box 581611   Tulsa, OK 74158

Phone: 918.836.6767   Fax: 918.836.0141


e-mail: bkwinc@aol.com


BKW Home Pig Switches Tadpole Pig Pigging Equipment Anchors Slug Catcher
Engineering Support Custom Services Roof Raising Research & Development
 Gas Gathering System For Sale Download Articles anipatern01_a.gif Pipeline College Contact Us
  Bullets010.gifClick here to view our latest projects!  
Website by PRO Designs